arrow electronics ecia (neda) member authorized distributor
元器件型號(hào) |
廠商 |
描述 |
arrow# |
數(shù)量 |
價(jià)格 |
es1b |
fairchild semiconductor |
diode switching 100v 1a 2-pin do-214ac t/r |
es1b**mult1 |
5832 |
|
rs1b |
fairchild semiconductor |
diode switching 100v 1a 2-pin do-214ac t/r |
rs1b**mult1 |
7494 |
|
s1b |
fairchild semiconductor |
diode switching 100v 1a 2-pin do-214ac t/r |
s1b**mult1 |
6974 |
|
avnet express ecia (neda) member authorized distributor
元器件型號(hào) |
廠商 |
描述 |
avnet # |
數(shù)量 |
價(jià)格 |
es1b-m3/5at
|
vishay / semiconductor |
1a,100v,15ns,uf rect, smd |
es1b-m3/5at |
19 wks factory lead time |
|
us1b-m3/5at
|
vishay / semiconductor |
1a,100v,50ns,uf rect,smd |
us1b-m3/5at |
4 wks factory lead time |
|
us1b-m3/61t
|
vishay / semiconductor |
1a,100v,50ns,uf rect,smd |
us1b-m3/61t |
4 wks factory lead time |
|
es1b-m3/61t
|
vishay / semiconductor |
1a,100v,15ns,uf rect, smd |
es1b-m3/61t |
3 wks factory lead time |
|
s1b-m3/5at
|
vishay / semiconductor |
1a,100v,smrectifier |
s1b-m3/5at |
25 wks factory lead time |
|
s1b-m3/61t
|
vishay / semiconductor |
1a,100v,smrectifier |
s1b-m3/61t |
3 wks factory lead time |
|
rs1b-m3/5at
|
vishay / semiconductor |
1a,100v,smrectifier |
rs1b-m3/5at |
25 wks factory lead time |
|
rs1b-m3/61t
|
vishay / semiconductor |
1a,100v,smrectifier |
rs1b-m3/61t |
25 wks factory lead time |
|